Frequently Asked Questions

  • Do you convert tubs to showers?

    Yes, we specialize in converting tubs to walk-in showers as part of our complete bathroom renovation services. We handle all plumbing upgrades and custom tile work needed for the conversion.
  • Can you finish my unfinished basement?

    Yes, we convert unfinished basements into functional living spaces. Our basement finishing includes proper insulation, flooring, lighting, and custom design solutions tailored to your needs.
  • Do you serve Seattle and Bellevue?

    Yes, we serve Seattle, Bellevue, Redmond, Tacoma, and Everett in addition to our primary location in Renton, WA.
  • Can you convert garages into rooms?

    Yes, we provide complete garage conversion services. We handle design, permits, insulation, and finishes to create guest suites, home offices, or expanded living areas.
  • Do you build custom kitchen cabinets?

    Yes, we provide custom cabinets as part of our full kitchen renovations. We also install countertops, backsplashes, flooring, and create open concept layouts.
  • Are your decks built for weather?

    Yes, our custom decks use premium materials specifically suitable for the Pacific Northwest climate. We design them to meet local outdoor living needs and weather conditions.
  • Do you handle electrical work too?

    Yes, we provide electrical services for remodeling projects including wiring updates, outlet installation, lighting upgrades, and electrical system improvements.
  • Can you frame new home additions?

    Yes, we provide expert framing for new builds and home additions. Our precise installation meets local building codes and structural integrity requirements.
  • Do you do whole house renovations?

    Yes, we handle complete home transformation projects. We manage all aspects from design to completion to enhance functionality, comfort, and property value.
  • How long does a complete kitchen remodel typically take?

    A full kitchen remodel usually spans 4–5 weeks. This estimated timeframe includes essential upfront stages like design consultation, material selection, and preparatory work, followed by the demolition and installation phases.

  • What is the typical timeline for a bathroom renovation?

    The duration depends on the scope:


    - A remodel for a small bathroom, including a tub or walk-in shower conversion, generally takes 10–14 days.


    - A master bathroom remodel is more variable, based on its size and complexity, but typically takes around 4–5 weeks to complete.

  • What is the process for adding an Accessory Dwelling Unit (ADU) to my property?

    Building an ADU requires a construction permit in most US states. The process begins with engineering/architectural plans and design to prepare for the permit application. Once the plans are approved by the city or county, we can then accurately estimate the budget and scope of work. Remember, the size of the ADU addition significantly influences both the permitting process and the final project budget.

  • Why should I hire a General Contractor (GC) for my renovation project?

    A licensed, insured, and bonded General Contractor is the best choice for any remodel. A GC acts as your "one-stop-shop," managing all project facets. Key benefits include:


    -Project Management: They coordinate the entire project, scheduling and managing all subcontractors and vendors.


    -Quality Assurance: They provide a comprehensive warranty for both labor and materials.


    -Risk Mitigation: Their licensing and insurance protect you from liability and unexpected issues.